{"id":7387,"date":"2025-10-27T08:54:52","date_gmt":"2025-10-27T04:54:52","guid":{"rendered":"https:\/\/tbh.toniconline.com.au\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/"},"modified":"2025-11-12T08:25:58","modified_gmt":"2025-11-12T04:25:58","slug":"east-rockingham-waste-to-energy-facility-2","status":"publish","type":"cpt-project","link":"https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/","title":{"rendered":"East Rockingham Waste to Energy Facility"},"content":{"rendered":"<h3>Project Overview<\/h3>\n<p>The East Rockingham Waste to Energy facility will recover resources from approximately 300,000 tonnes of residual waste from municipal, commercial and industrial sources per year, and up to 30,000 tonnes of biosolids.<\/p>\n<p>The Waste to Energy facility will generate approximately 29 megawatts of reliable renewable energy, enough to power over 36,000 homes. Acciona in partnership with Hitachi Zosen Inova Australia (HZI) has been awarded the contract to design and construct the facility.<\/p>\n<p>&nbsp;<\/p>\n<h3>TBH\u2019s Role<\/h3>\n<p>TBH was engaged by Acciona to provide specialist programming services from the commencement of the project through to including commissioning, as follows:<\/p>\n<ul>\n<li>Update the WBS to be clear and concise<\/li>\n<li>Develop the detailed delivery baseline programme including, design, procurement, construction, and commissioning<\/li>\n<li>Determine the interface milestones between the JV partners and main subcontractors for design, procurement and onsite works and replan where required to maintain the Date for Practical Completion<\/li>\n<li>Resource load the program to determine peak resources and level resources for the overall site<\/li>\n<li>Undertake a schedule risk analysis to model and quantify the likely impacts due to inclement weather, design and procurement delays, different construction sequences and specific site restrictions<\/li>\n<li>Status the programme and provide critical path analysis to identify risks and mitigations<\/li>\n<li>Analyse productivity rates and forecast completion dates based on actual rates<\/li>\n<li>Prepare regular health checks, sensitivity analysis and delay claims<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Project Overview The East Rockingham Waste to Energy facility will recover resources from approximately 300,000 tonnes of residual waste from municipal, commercial and industrial sources per year, and up to 30,000 tonnes of biosolids. The Waste to Energy facility will generate approximately 29 megawatts of reliable renewable energy, enough to power over 36,000 homes. Acciona &#8230;<\/p>\n","protected":false},"featured_media":7388,"template":"","class_list":["post-7387","cpt-project","type-cpt-project","status-publish","has-post-thumbnail","hentry","service_category-planning-scheduling","industry_category-energy","region_category-australia","group_category-tbh"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.1 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>East Rockingham Waste to Energy Facility - TBH Middle East<\/title>\n<meta name=\"description\" content=\"Discover how TBH supported Acciona on the East Rockingham Waste to Energy Facility, providing expert programming, schedule risk analysis, and project controls to ensure timely delivery of 29MW of renewable power for 36,000 homes.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"East Rockingham Waste to Energy Facility\" \/>\n<meta property=\"og:description\" content=\"Discover how TBH supported Acciona on the East Rockingham Waste to Energy Facility, providing expert programming, schedule risk analysis, and project controls to ensure timely delivery of 29MW of renewable power for 36,000 homes.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/\" \/>\n<meta property=\"og:site_name\" content=\"TBH Middle East\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-12T04:25:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tbhconsultancy.com\/mena\/wp-content\/uploads\/sites\/4\/2025\/11\/iStock-492946820-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1707\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/experience\\\/east-rockingham-waste-to-energy-facility-2\\\/\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/experience\\\/east-rockingham-waste-to-energy-facility-2\\\/\",\"name\":\"East Rockingham Waste to Energy Facility - TBH Middle East\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/experience\\\/east-rockingham-waste-to-energy-facility-2\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/experience\\\/east-rockingham-waste-to-energy-facility-2\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2025\\\/11\\\/iStock-492946820-scaled.jpg\",\"datePublished\":\"2025-10-27T04:54:52+00:00\",\"dateModified\":\"2025-11-12T04:25:58+00:00\",\"description\":\"Discover how TBH supported Acciona on the East Rockingham Waste to Energy Facility, providing expert programming, schedule risk analysis, and project controls to ensure timely delivery of 29MW of renewable power for 36,000 homes.\",\"inLanguage\":\"en-AE\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/experience\\\/east-rockingham-waste-to-energy-facility-2\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AE\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/experience\\\/east-rockingham-waste-to-energy-facility-2\\\/#primaryimage\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2025\\\/11\\\/iStock-492946820-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2025\\\/11\\\/iStock-492946820-scaled.jpg\",\"width\":2560,\"height\":1707,\"caption\":\"Outside of a waste management facility. Treatment and disposal of waste. Prevention of waste production through in-process modification, reuse and recycling. Convert waste materials into new products.\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/#website\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/\",\"name\":\"TBH Middle East\",\"description\":\"Independent project advisory. Undisputed project excellence.\",\"publisher\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-AE\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/#organization\",\"name\":\"Tracey Brunstrom & Hammond (TBH)\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-AE\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2020\\\/11\\\/cropped-Website-Logo_512x512.png\",\"contentUrl\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2020\\\/11\\\/cropped-Website-Logo_512x512.png\",\"width\":512,\"height\":512,\"caption\":\"Tracey Brunstrom & Hammond (TBH)\"},\"image\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/mena\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"East Rockingham Waste to Energy Facility - TBH Middle East","description":"Discover how TBH supported Acciona on the East Rockingham Waste to Energy Facility, providing expert programming, schedule risk analysis, and project controls to ensure timely delivery of 29MW of renewable power for 36,000 homes.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/","og_locale":"en_US","og_type":"article","og_title":"East Rockingham Waste to Energy Facility","og_description":"Discover how TBH supported Acciona on the East Rockingham Waste to Energy Facility, providing expert programming, schedule risk analysis, and project controls to ensure timely delivery of 29MW of renewable power for 36,000 homes.","og_url":"https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/","og_site_name":"TBH Middle East","article_modified_time":"2025-11-12T04:25:58+00:00","og_image":[{"width":2560,"height":1707,"url":"https:\/\/tbhconsultancy.com\/mena\/wp-content\/uploads\/sites\/4\/2025\/11\/iStock-492946820-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/","url":"https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/","name":"East Rockingham Waste to Energy Facility - TBH Middle East","isPartOf":{"@id":"https:\/\/tbhconsultancy.com\/mena\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/#primaryimage"},"image":{"@id":"https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/#primaryimage"},"thumbnailUrl":"https:\/\/tbhconsultancy.com\/mena\/wp-content\/uploads\/sites\/4\/2025\/11\/iStock-492946820-scaled.jpg","datePublished":"2025-10-27T04:54:52+00:00","dateModified":"2025-11-12T04:25:58+00:00","description":"Discover how TBH supported Acciona on the East Rockingham Waste to Energy Facility, providing expert programming, schedule risk analysis, and project controls to ensure timely delivery of 29MW of renewable power for 36,000 homes.","inLanguage":"en-AE","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/"]}]},{"@type":"ImageObject","inLanguage":"en-AE","@id":"https:\/\/tbhconsultancy.com\/mena\/experience\/east-rockingham-waste-to-energy-facility-2\/#primaryimage","url":"https:\/\/tbhconsultancy.com\/mena\/wp-content\/uploads\/sites\/4\/2025\/11\/iStock-492946820-scaled.jpg","contentUrl":"https:\/\/tbhconsultancy.com\/mena\/wp-content\/uploads\/sites\/4\/2025\/11\/iStock-492946820-scaled.jpg","width":2560,"height":1707,"caption":"Outside of a waste management facility. Treatment and disposal of waste. Prevention of waste production through in-process modification, reuse and recycling. Convert waste materials into new products."},{"@type":"WebSite","@id":"https:\/\/tbhconsultancy.com\/mena\/#website","url":"https:\/\/tbhconsultancy.com\/mena\/","name":"TBH Middle East","description":"Independent project advisory. Undisputed project excellence.","publisher":{"@id":"https:\/\/tbhconsultancy.com\/mena\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tbhconsultancy.com\/mena\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-AE"},{"@type":"Organization","@id":"https:\/\/tbhconsultancy.com\/mena\/#organization","name":"Tracey Brunstrom & Hammond (TBH)","url":"https:\/\/tbhconsultancy.com\/mena\/","logo":{"@type":"ImageObject","inLanguage":"en-AE","@id":"https:\/\/tbhconsultancy.com\/mena\/#\/schema\/logo\/image\/","url":"https:\/\/tbhconsultancy.com\/mena\/wp-content\/uploads\/sites\/4\/2020\/11\/cropped-Website-Logo_512x512.png","contentUrl":"https:\/\/tbhconsultancy.com\/mena\/wp-content\/uploads\/sites\/4\/2020\/11\/cropped-Website-Logo_512x512.png","width":512,"height":512,"caption":"Tracey Brunstrom & Hammond (TBH)"},"image":{"@id":"https:\/\/tbhconsultancy.com\/mena\/#\/schema\/logo\/image\/"}}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/tbhconsultancy.com\/mena\/wp-json\/wp\/v2\/cpt-project\/7387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tbhconsultancy.com\/mena\/wp-json\/wp\/v2\/cpt-project"}],"about":[{"href":"https:\/\/tbhconsultancy.com\/mena\/wp-json\/wp\/v2\/types\/cpt-project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tbhconsultancy.com\/mena\/wp-json\/wp\/v2\/media\/7388"}],"wp:attachment":[{"href":"https:\/\/tbhconsultancy.com\/mena\/wp-json\/wp\/v2\/media?parent=7387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}