{"id":1604,"date":"2020-12-08T15:01:14","date_gmt":"2020-12-08T04:01:14","guid":{"rendered":"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/"},"modified":"2025-11-14T10:31:48","modified_gmt":"2025-11-13T23:31:48","slug":"victoria-cross-integrated-station-development","status":"publish","type":"cpt-project","link":"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/","title":{"rendered":"Victoria Cross Integrated Station Development"},"content":{"rendered":"<h3>Project Overview<\/h3>\n<p>The Victoria Cross Integrated Station Development is a $1 Billion project as part of the Sydney Metro City and South West Project. Located in the busy Commercial suburb of North Sydney the southern site is 4500m2 and includes a 42 storey commercial office building above the station\u2019s southern entrance and a small retail precinct. There is also a small northern entrance. The station consists of the two entrances with adits connecting to a central cavern beneath Miller Street with an island platform.<\/p>\n<p>The project also requires interface with several contractors including TSE who are responsible for excavating the station boxes and the cavern, TSOM and Linewide who are responsible for fitting out the rail related statin services and the cavern, and Sydney Metro.<\/p>\n<p>&nbsp;<\/p>\n<h3>TBH\u2019s Role<\/h3>\n<p>TBH was initially engaged to help prepare a tender programme for the project as part of Lendlease\u2019s tender submission. Following submission, TBH worked with Lendlease to provide support and close out the contract. After Lendlease was awarded the contract, TBH was again engaged to provide programming support for the project duration from design through to construction.<\/p>\n<p>&nbsp;<\/p>\n<h3>The TBH Difference<\/h3>\n<p>TBH provided additional support to Lendlease during the tender period through assisting in construction methodology and resource planning to undertaking a Schedule Risk Analysis to ensure the risks associated with the project were included in Lendlease\u2019s offer and minimise their exposure to liquidated damages. After contract award, TBH provided further construction methodology advice to ensure the best approach was being adopted for the design being developed and also to reduce the construction duration and costs.<\/p>\n<p>To find out more about TBH\u2019s Planning &amp; Scheduling experience, please visit the <a href=\"https:\/\/tbhconsultancy.com\/services\/programming-scheduling-advisory\/\">Planning &amp; Scheduling<\/a> page.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Overview The Victoria Cross Integrated Station Development is a $1 Billion project as part of the Sydney Metro City and South West Project. Located in the busy Commercial suburb of North Sydney the southern site is 4500m2 and includes a 42 storey commercial office building above the station\u2019s southern entrance and a small retail &#8230;<\/p>\n","protected":false},"featured_media":1605,"template":"","class_list":["post-1604","cpt-project","type-cpt-project","status-publish","has-post-thumbnail","hentry","service_category-planning-scheduling","industry_category-transport","industry_category-rail","region_category-australia","group_category-tbh"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.1 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Victoria Cross Integrated Station Development | TBH Asia<\/title>\n<meta name=\"description\" content=\"TBH was engaged by Lendlease to prepare a tender programme and provide programming support for the Victoria Cross Integrated Station Development project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Victoria Cross Integrated Station Development\" \/>\n<meta property=\"og:description\" content=\"TBH was engaged by Lendlease to prepare a tender programme and provide programming support for the Victoria Cross Integrated Station Development project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/\" \/>\n<meta property=\"og:site_name\" content=\"TBH Asia\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-13T23:31:48+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tbhconsultancy.com\/sg\/wp-content\/uploads\/sites\/2\/2020\/12\/Modern-Rail-Tunnel-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1704\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/victoria-cross-integrated-station-development\\\/\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/victoria-cross-integrated-station-development\\\/\",\"name\":\"Victoria Cross Integrated Station Development | TBH Asia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/victoria-cross-integrated-station-development\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/victoria-cross-integrated-station-development\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2020\\\/12\\\/Modern-Rail-Tunnel-scaled.jpg\",\"datePublished\":\"2020-12-08T04:01:14+00:00\",\"dateModified\":\"2025-11-13T23:31:48+00:00\",\"description\":\"TBH was engaged by Lendlease to prepare a tender programme and provide programming support for the Victoria Cross Integrated Station Development project.\",\"inLanguage\":\"en-SG\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/victoria-cross-integrated-station-development\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-SG\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/victoria-cross-integrated-station-development\\\/#primaryimage\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2020\\\/12\\\/Modern-Rail-Tunnel-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2020\\\/12\\\/Modern-Rail-Tunnel-scaled.jpg\",\"width\":2560,\"height\":1704,\"caption\":\"Victoria Cross Integrated Station Development\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/#website\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/\",\"name\":\"TBH Singapore\",\"description\":\"Independent project advisory. Undisputed project excellence.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-SG\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Victoria Cross Integrated Station Development | TBH Asia","description":"TBH was engaged by Lendlease to prepare a tender programme and provide programming support for the Victoria Cross Integrated Station Development project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/","og_locale":"en_US","og_type":"article","og_title":"Victoria Cross Integrated Station Development","og_description":"TBH was engaged by Lendlease to prepare a tender programme and provide programming support for the Victoria Cross Integrated Station Development project.","og_url":"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/","og_site_name":"TBH Asia","article_modified_time":"2025-11-13T23:31:48+00:00","og_image":[{"width":2560,"height":1704,"url":"https:\/\/tbhconsultancy.com\/sg\/wp-content\/uploads\/sites\/2\/2020\/12\/Modern-Rail-Tunnel-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/","url":"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/","name":"Victoria Cross Integrated Station Development | TBH Asia","isPartOf":{"@id":"https:\/\/tbhconsultancy.com\/sg\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/#primaryimage"},"image":{"@id":"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/#primaryimage"},"thumbnailUrl":"https:\/\/tbhconsultancy.com\/sg\/wp-content\/uploads\/sites\/2\/2020\/12\/Modern-Rail-Tunnel-scaled.jpg","datePublished":"2020-12-08T04:01:14+00:00","dateModified":"2025-11-13T23:31:48+00:00","description":"TBH was engaged by Lendlease to prepare a tender programme and provide programming support for the Victoria Cross Integrated Station Development project.","inLanguage":"en-SG","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/"]}]},{"@type":"ImageObject","inLanguage":"en-SG","@id":"https:\/\/tbhconsultancy.com\/sg\/experience\/victoria-cross-integrated-station-development\/#primaryimage","url":"https:\/\/tbhconsultancy.com\/sg\/wp-content\/uploads\/sites\/2\/2020\/12\/Modern-Rail-Tunnel-scaled.jpg","contentUrl":"https:\/\/tbhconsultancy.com\/sg\/wp-content\/uploads\/sites\/2\/2020\/12\/Modern-Rail-Tunnel-scaled.jpg","width":2560,"height":1704,"caption":"Victoria Cross Integrated Station Development"},{"@type":"WebSite","@id":"https:\/\/tbhconsultancy.com\/sg\/#website","url":"https:\/\/tbhconsultancy.com\/sg\/","name":"TBH Singapore","description":"Independent project advisory. Undisputed project excellence.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tbhconsultancy.com\/sg\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-SG"}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/tbhconsultancy.com\/sg\/wp-json\/wp\/v2\/cpt-project\/1604","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tbhconsultancy.com\/sg\/wp-json\/wp\/v2\/cpt-project"}],"about":[{"href":"https:\/\/tbhconsultancy.com\/sg\/wp-json\/wp\/v2\/types\/cpt-project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tbhconsultancy.com\/sg\/wp-json\/wp\/v2\/media\/1605"}],"wp:attachment":[{"href":"https:\/\/tbhconsultancy.com\/sg\/wp-json\/wp\/v2\/media?parent=1604"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}