{"id":7636,"date":"2025-10-27T12:50:20","date_gmt":"2025-10-27T01:50:20","guid":{"rendered":"https:\/\/tbh.toniconline.com.au\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/"},"modified":"2025-11-12T15:24:59","modified_gmt":"2025-11-12T04:24:59","slug":"asahan-3-hydro-electric-power-plant-hepp","status":"publish","type":"cpt-project","link":"https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/","title":{"rendered":"Asahan 3 Hydro Electric Power Plant (HEPP)"},"content":{"rendered":"<h3>Project Overview<\/h3>\n<p>This Hydroelectric Power Plant was conceived with the key objective of harnessing the hydropower potential of the Asahan River in North Sumatra, Indonesia. The project is located in the river\u2019s upper reaches, just below an existing hydropower plant. It involved the construction of an intake structure on the Asahan River, headrace channel and conduit, pressured headrace tunnel, and underground generation facilities including waterway tunnels and powerhouse cavern with associated hydraulic, electrical, and mechanical equipment. A government<br \/>\nagency engaged our client as the supervising engineering consultant for the project, with major elements of construction divided into five (5) distinct contract packages.<\/p>\n<p>&nbsp;<\/p>\n<h3>TBH\u2019s Role<\/h3>\n<p>TBH was engaged by our client in early 2021 to establish a bespoke Risk Management Framework (RMF) for the project, and to undertake Quantitative Cost and Schedule Risk Analyses (QCSRA). At that time, the project had already encountered delays prior to 2020 and further delays on account of Covid-19 thereafter. The RMF was developed to support ongoing efforts to manage project risk. The OCSRA identified key project risks, the probable time required to reach project completion, and the associated cost to complete the works.<\/p>\n<p>Based on the OCSRA carried out by TBH, project stakeholders were empowered with an understanding of the key project risks that were likely to control the project timeframe and budget. Leveraging this knowledge, monitoring and control efforts could be focused on those project activities deemed most vulnerable to the risks identified through TBH\u2019s analyses. The bespoke RMF developed by TBH allowed our client and the government agency to adopt a structured and project-specific approach to risk management, ensuring risks were dealt with appropriately, effectively, and the Project was delivered close to TBH\u2019s P80 prediction.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Overview This Hydroelectric Power Plant was conceived with the key objective of harnessing the hydropower potential of the Asahan River in North Sumatra, Indonesia. The project is located in the river\u2019s upper reaches, just below an existing hydropower plant. It involved the construction of an intake structure on the Asahan River, headrace channel and &#8230;<\/p>\n","protected":false},"featured_media":7637,"template":"","class_list":["post-7636","cpt-project","type-cpt-project","status-publish","has-post-thumbnail","hentry","service_category-risk-management","industry_category-energy","region_category-indonesia","group_category-tbh"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v22.1 (Yoast SEO v27.3) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Asahan 3 Hydro Electric Power Plant (HEPP) | TBH Asia<\/title>\n<meta name=\"description\" content=\"Discover how TBH supported the Asahan River Hydroelectric Project in Indonesia with a bespoke Risk Management Framework and quantitative cost and schedule risk analysis to control delays and costs.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Asahan 3 Hydro Electric Power Plant (HEPP)\" \/>\n<meta property=\"og:description\" content=\"Discover how TBH supported the Asahan River Hydroelectric Project in Indonesia with a bespoke Risk Management Framework and quantitative cost and schedule risk analysis to control delays and costs.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/\" \/>\n<meta property=\"og:site_name\" content=\"TBH Asia\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-12T04:24:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/tbhconsultancy.com\/sg\/wp-content\/uploads\/sites\/2\/2025\/11\/aSAHAN.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1820\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/asahan-3-hydro-electric-power-plant-hepp\\\/\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/asahan-3-hydro-electric-power-plant-hepp\\\/\",\"name\":\"Asahan 3 Hydro Electric Power Plant (HEPP) | TBH Asia\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/asahan-3-hydro-electric-power-plant-hepp\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/asahan-3-hydro-electric-power-plant-hepp\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2025\\\/11\\\/aSAHAN.jpg\",\"datePublished\":\"2025-10-27T01:50:20+00:00\",\"dateModified\":\"2025-11-12T04:24:59+00:00\",\"description\":\"Discover how TBH supported the Asahan River Hydroelectric Project in Indonesia with a bespoke Risk Management Framework and quantitative cost and schedule risk analysis to control delays and costs.\",\"inLanguage\":\"en-SG\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/asahan-3-hydro-electric-power-plant-hepp\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-SG\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/experience\\\/asahan-3-hydro-electric-power-plant-hepp\\\/#primaryimage\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2025\\\/11\\\/aSAHAN.jpg\",\"contentUrl\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/wp-content\\\/uploads\\\/sites\\\/2\\\/2025\\\/11\\\/aSAHAN.jpg\",\"width\":1820,\"height\":1080},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/#website\",\"url\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/\",\"name\":\"TBH Singapore\",\"description\":\"Independent project advisory. Undisputed project excellence.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/tbhconsultancy.com\\\/sg\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-SG\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Asahan 3 Hydro Electric Power Plant (HEPP) | TBH Asia","description":"Discover how TBH supported the Asahan River Hydroelectric Project in Indonesia with a bespoke Risk Management Framework and quantitative cost and schedule risk analysis to control delays and costs.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/","og_locale":"en_US","og_type":"article","og_title":"Asahan 3 Hydro Electric Power Plant (HEPP)","og_description":"Discover how TBH supported the Asahan River Hydroelectric Project in Indonesia with a bespoke Risk Management Framework and quantitative cost and schedule risk analysis to control delays and costs.","og_url":"https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/","og_site_name":"TBH Asia","article_modified_time":"2025-11-12T04:24:59+00:00","og_image":[{"width":1820,"height":1080,"url":"https:\/\/tbhconsultancy.com\/sg\/wp-content\/uploads\/sites\/2\/2025\/11\/aSAHAN.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/","url":"https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/","name":"Asahan 3 Hydro Electric Power Plant (HEPP) | TBH Asia","isPartOf":{"@id":"https:\/\/tbhconsultancy.com\/sg\/#website"},"primaryImageOfPage":{"@id":"https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/#primaryimage"},"image":{"@id":"https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/#primaryimage"},"thumbnailUrl":"https:\/\/tbhconsultancy.com\/sg\/wp-content\/uploads\/sites\/2\/2025\/11\/aSAHAN.jpg","datePublished":"2025-10-27T01:50:20+00:00","dateModified":"2025-11-12T04:24:59+00:00","description":"Discover how TBH supported the Asahan River Hydroelectric Project in Indonesia with a bespoke Risk Management Framework and quantitative cost and schedule risk analysis to control delays and costs.","inLanguage":"en-SG","potentialAction":[{"@type":"ReadAction","target":["https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/"]}]},{"@type":"ImageObject","inLanguage":"en-SG","@id":"https:\/\/tbhconsultancy.com\/sg\/experience\/asahan-3-hydro-electric-power-plant-hepp\/#primaryimage","url":"https:\/\/tbhconsultancy.com\/sg\/wp-content\/uploads\/sites\/2\/2025\/11\/aSAHAN.jpg","contentUrl":"https:\/\/tbhconsultancy.com\/sg\/wp-content\/uploads\/sites\/2\/2025\/11\/aSAHAN.jpg","width":1820,"height":1080},{"@type":"WebSite","@id":"https:\/\/tbhconsultancy.com\/sg\/#website","url":"https:\/\/tbhconsultancy.com\/sg\/","name":"TBH Singapore","description":"Independent project advisory. Undisputed project excellence.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/tbhconsultancy.com\/sg\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-SG"}]}},"acf":[],"_links":{"self":[{"href":"https:\/\/tbhconsultancy.com\/sg\/wp-json\/wp\/v2\/cpt-project\/7636","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tbhconsultancy.com\/sg\/wp-json\/wp\/v2\/cpt-project"}],"about":[{"href":"https:\/\/tbhconsultancy.com\/sg\/wp-json\/wp\/v2\/types\/cpt-project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tbhconsultancy.com\/sg\/wp-json\/wp\/v2\/media\/7637"}],"wp:attachment":[{"href":"https:\/\/tbhconsultancy.com\/sg\/wp-json\/wp\/v2\/media?parent=7636"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}