Dubai Metro – Route 2020

UAE

Project Overview

The Project comprises of design, construction, commissioning, system maintenance and assistance in operation of the Route 2020 Metro Rail Project, the extension of the Red Line to the EXPO 2020 as well the enhancement of both existing Red and Green Line. A 15-km-long alignment consisting of 11.8 km of elevated guideways and 3.2 km of tunnel, Seven LEED Gold stations consisting of one interchange station, three elevated stations, two underground stations, Construction of three new main power supply (MPS) stations and one additional traction power supply station (TPS) and the special-event Expo Iconic Station. The Contractor is EXPOLINK (Alstom, Acciona & Gulermak).

 

TBH’s Role

TBH has been appointed by EXPOLINK to assist in planning and scheduling of Rail Master programme.

TBH was involved from the inception stage and has provided services in preparation of baseline programme for the viaducts, Rails, TTM, & utilities. TBH has also assisted in incorporating the design programme into the overall master programme, cost and resource loading the programme, preparation of daily and weekly reports, preparing minutes for the stakeholder meeting, overviewing subcontractor’s programme and monitoring the progress and propose mitigation measures.

TBH was also involved in the preparation of detailed schedules for different Systems Under track works along with the preparation of daily/weekly/monthly reports and dashboards, TBH has assisted in modifying the sequence of the work, changing the strategies and managing the earned value.

To find out more about TBH’s Planning & Scheduling experience, please visit the Planning & Scheduling page.

Project Overview

Client EXPOLINK (Alstom, Acciona & Gulermak)
Services Planning and Scheduling
Value $10,600,000,000 AED
Duration 2016 - 2018